Eclipse Electrical& Energy Services
  1. Home
  2. Panel upgrades
  3. Federal Pacific & Zinsco panels

Federal Pacific and Zinsco panel replacement

Thousands of Northern Virginia homes built from the 1950s to the 1980s still have a Federal Pacific Stab-Lok or Zinsco panel. Their breakers have a long record of failing to trip when they should. We replace them with a new, code-compliant panel, usually in one day.

Is your panel one of these?

Open the panel door and look at the labels and breakers. Don't remove the inner cover yourself, since the parts behind it are live.

  • Federal Pacific Electric (FPE): "Federal Pacific," "FPE" or "Stab-Lok" on the door, the label inside or the breakers. Many FPE breakers have a red stripe or red tips on the handles.
  • Zinsco or Sylvania-Zinsco: "Zinsco," "Sylvania" or "GTE Sylvania" on the label. The breakers are often thin and come in a mix of colors.
  • Other panels worth a look: some Challenger panels, Pushmatic panels, and old fuse boxes.

Not sure? Text a photo of the panel door and the label to (571) 738-4510 and we'll tell you what you have.

Why electricians recommend replacing them

A circuit breaker has one job: shut off the power when a wire is overloaded or shorted. Independent tests of Federal Pacific Stab-Lok breakers have found many that don't trip when they should. That leaves wires to overheat inside the walls.

Zinsco panels have a different weak spot. Their breakers can loosen or overheat where they clip onto the panel. Sometimes a breaker even melts onto the bar it connects to, so it can no longer shut off the power.

To be clear, neither brand was ever formally recalled. The Consumer Product Safety Commission investigated Federal Pacific breakers in the early 1980s and closed the case without a recall. But both brands are long out of production, and most electricians and home inspectors recommend replacing them.

Selling, buying or insuring a home

Home inspectors in Northern Virginia routinely flag these panels, and some insurance companies charge more or won't cover a home that has one. If a buyer, inspector or insurer has asked about your panel, we can give you a written estimate quickly so it doesn't hold up your sale or your policy.

What the replacement includes

  • A new panel and new breakers from a current manufacturer
  • A load calculation, and the option to upgrade to 150 or 200 amps at the same time
  • Arc-fault and ground-fault protection where current code calls for it
  • Grounding and bonding brought up to code
  • The permit, the inspection, and coordination with Dominion Energy or NOVEC for the disconnect and reconnect
  • Every circuit labeled, and a walkthrough of the new panel before we leave

Planning an EV charger, a heat pump or an addition? Tell us when you request the estimate, so we can size the new panel for it now. See panel upgrades for more on service upgrades.

Common questions

Were Federal Pacific panels recalled?

No. The Consumer Product Safety Commission investigated Federal Pacific Stab-Lok breakers in the early 1980s and closed the investigation without a recall. Independent testing since then has found many of these breakers fail to trip, which is why most electricians and home inspectors recommend replacing them.

My panel works fine. Do I really need to replace it?

A breaker that won't trip looks exactly like one that works, until there's an overload or a short. Nothing forces you to replace it, but we recommend it, and many homeowners do it before selling or when an insurer asks.

Can you just replace the breakers?

We don't recommend it. With Zinsco and Federal Pacific panels, the problems often involve how the breakers connect to the panel itself, so new breakers in the old panel don't fix the underlying issue. Replacing the whole panel is the reliable fix.

How much does it cost?

It depends on the size of the panel, whether the meter base or service wires also need work, and whether you want to upgrade to 200 amps at the same time. We give free, written estimates, so you'll know the full price before any work starts.

How long does it take?

Most panel replacements take one day, with the power off for part of that day. We schedule it with you ahead of time and handle the inspection and the utility disconnect and reconnect.

Find out what's in your wall

Free estimates. Written price before any work starts.